Pokukrom East


On October 7, 2010, Pelangio announced a third discovery on the Manfo Property at Pokukrom East, where drilling encountered near-surface high-grade gold (7.01 g/t gold over 19 metres) as well as broad bulk tonnage grades (1.64 g/t over 33 metres and 1.03 g/t over 46 metres) along an over 800 metre strike length of the 1,300 metre long Pokukrom East anomaly.

Highlights of the Pokukrom East Gold Zone include:
  • Open strike length of 850+ metres, with mineralization intersected up to 250 metres north of the defined anomaly;
  • Confirmed to depths up to 275+ metres;
  • Broad bulk tonnage zone averaging between 1.0 and 1.5 g/t gold over 30-70+ metres width;
  • Shallow plunging higher grade footwall zone identified from section 49350 to 49900, with a currently defined plunge of 600 metres from near surface to 210 metres depth;
  • Potential for new mineralized zones in the hanging wall and new shoots on strike to the north and south.

Significant intersections at Pokukrom East include:

Area DHID From
(metre)
To
(metre)
Interval
(metres)1
Au
(g/t)
Pokukrom East
SPDD-085 98 131 33 1.64

 


including
116 129 13 3.37

 


SPDD-088 35 54 19 7.01 

 


and
35 40 5 24.7

 


SPDD-089 56 102 46 1.03

 


SPDD-106 2 54 52 1.36

 


including
41 54 13 3.47

 


SPDD-107 63 135 72 1.13

 


including 83 134 51 1.50

 


including 116 127 11 3.53

 


SPDD-110 117 133 16 2.14

 


SPDD-113 91 103 12 4.18

 


including
96 101 5 9.49
   SPDD-124 221
225
4
4.52
   SPDD-125 210
232
22
1.00
   SPDD-127 161
246
85
0.89
   including  204 246
42
1.53
  SPDD-128
62
78
16
1.59

SPDD-129  11 48  38  1.01
  SPDD-152 50 65 15 1.38
  and  102 156  54  1.20
   including  142 155  13 3.26
  SPDD-153   58  74 16  1.20
  and  149  224  75  0.61 
  including   185  215 30  0.90 
   SPDD-156 22  22  1.06 
  SPDD-157  163  223  60  1.00 
  SPDD-166  263  282  19  2.24 
  SPDD-172  23  23  1.03 
  SPDD-178  170  196  26  1.35 
   including  170  181  11  2.51 
  SPDD-179  171  253  82  1.12 
  including  217  231  14  3.12 
  SPDD-180  229  284  55  1.20 
  including  237  251  14  2.50 
  SPDD-184  131  244  113  1.19 
  including  215  222  9.05 
  SPDD-186  190  252  62  1.17 
  including  210  232  22  2.61 
  SPDD-188  96  160  64  2.60 
   including  136  146  10  11.94 
  SPDD-192  49  53  16.72 
   and  59  182  23  1.41 
   including  70  81  11  2.52 
   SPDD-200 60  91  31  1.88 
   including  69  72  17.65 
   SPDD-208 93  113  20  1.06 
   including  93  107  14  1.44 
   SPDD-219 82  129  47  0.97 
  including  112  126  14  1.92 
   SPDD-223 174  203  29  1.41 
   including  185  193  3.05 
   SPDD-226 166  229 63  1.06 
   including  166  195  29  1.91 
  SPDD-231  116  138  22  0.96 
           
    Intervals are core length. Refer to the complete list of mineralized intersections below for estimates of true width.  Unless otherwise indicated, a cut-off grade of 0.2 g/t gold was used in calculating intervals with allowance for up to five metres of internal dilution.

 Plan View Mineralized 
Intersections 
Complete
Sections
 
 


Significant gold mineralization at broad intervals was intersected on each of the sections along strike. Each section indicates bulk tonnage potential with continuous mineralization that suggests the down-dip continuity of the mineralized zone.  Gold mineralization generally associated with a sericite-pyrite altered metagranitoid hosted shear, with higher grade zones of quartz-pyrite veining.  Lower grade mineralization occurs in hematite altered metagranitoid, which is peripheral alteration to the sericite hosted mineralization.

Drilling at Pokukrom East to date has consistently intersected intervals of higher grade gold mineralization from section to section over a significant strike length:

     Section DHID
    Core Length
    (m)
    Au
    (g/t)
     From
    (m)
    49350 SPDD-088  19  7.01   35
    49400 SPDD-200  17.65   69
    49450  SPDD-192   4 16.72   41
      SPDD-106  13  3.47   49
    49500  SPDD-107  11  3.53   116
    49550  SPDD-085  13  3.37   116
      SPDD-152  13  3.26  142
    49600 SPDD-188  10  11.94   136
      SPDD-223  3.05  185
    49650   SPDD-110 10  3.05  117
      SPDD-157  2.58   210 
    49700  SPDD-226  3.78   181 
    SPDD-179  14  3.12  217 
    49750   SPDD-186 3.74  223 
    49800  SPDD-184  9.05  215 
     49850  SPDD-128 13   2.25 216 
    49900  SPDD-178  11  2.51  180 
       SPDD-180  14 2.50  237 
    *Section 49400 has not yet been drilled.

The zone plunges to the north at approximately 40 degrees and has a currently defined plunge length of approximately 600 metres.