Indicated | Inferred | ||||||
---|---|---|---|---|---|---|---|
Category | Cut-off (Au gpt) | Quantity (000' tonnes) | Grade Au (gpt) | Contained Au (000' oz) | Quantity (000' tonnes) | Grade Au (gpt) | Contained Au (000' oz) |
* Mineral resources are not mineral reserves and do not have a demonstrated economic viability. All figures have been rounded to reflect the relative accuracy of the estimates. The cut-off grades are based on a gold price of US$1,450 per ounce and metallurgical recovery of 94 percent for laterite and oxide and transitional material and 86 percent for fresh material. Reported within conceptual open pit shells optimized and outside the pit above the pit bottom elevation. | |||||||
INSIDE PIT: |
|||||||
Laterite/Oxide | 0.40 | 49 | 0.96 | 2 | 458 | 1.07 | 16 |
Transitional | 0.50 | 382 | 1.96 | 24 | 876 | 1.13 | 32 |
Fresh | 0.50 | 3,543 | 1.49 | 169 | 918 | 1.09 | 32 |
Total | 3,973 | 1.52 | 195 | 2,253 | 1.10 | 80 | |
OUTSIDE PIT: |
|||||||
Laterite/Oxide | 0.40 | 50 | 0.68 | 1 | |||
Transitional | 0.50 | 217 | 0.72 | 5 | |||
Fresh | 0.50 | 7,146 | 0.93 | 213 | |||
Total | 7,413 | 0.92 | 218 | ||||
COMBINED INSIDE AND OUTSIDE PIT: |
|||||||
Laterite/Oxide | 0.40 | 49 | 0.96 | 2 | 508 | 1.05 | 17 |
Transitional | 0.50 | 382 | 1.96 | 24 | 1,093 | 1.05 | 37 |
Fresh | 0.50 | 3,543 | 1.49 | 169 | 8,064 | 0.94 | 245 |
Total | 3,973 | 1.52 | 195 | 9,666 | 0.96 | 298 |